LEADER 03666nam a22005295i 4500
001 806103
003 TR_AnAIT
005 20260127001425
007 cr nn 008mamaa
008 100301s2010 gw | s |||| 0|eng d
020 |a9783642021008|9978-3-642-02100-8
024 7 |a10.1007/978-3-642-02100-8|2doi
041 |aeng
049 |aTürk Tarih Kurumu Kütüphanesi
050 4|aK7000-7720.22
072 7|aLB|2bicssc
072 7|aLAM|2bicssc
072 7|aLAW051000|2bisacsh
072 7|aLB|2thema
072 7|aLAM|2thema
082 04|a340.9|223
090 |aDK/7413
100 1 |aJaeger, Axel-Volkmar.|eauthor.|4aut|4http://id.loc.gov/vocabulary/relators/aut
245 10|aFIDIC - A Guide for Practitioners|h[electronic resource] /|cby Axel-Volkmar Jaeger, Götz-Sebastian Hök.
250 |a1st ed. 2010.
264 1|aBerlin, Heidelberg :|bSpringer Berlin Heidelberg :|bImprint: Springer,|c2010.
300 |aXXXVI, 446 p. 41 illus., 20 illus. in color.|bonline resource.
336 |atext|btxt|2rdacontent
337 |acomputer|bc|2rdamedia
338 |aonline resource|bcr|2rdacarrier
347 |atext file|bPDF|2rda
505 0 |aLegal Systems -- Conflict of Laws -- English and International Standard Forms of Contract -- Civil Law Business Terms -- Development Stages -- Understanding FIDIC: A Civil Law Approach -- FIDIC Contract Documents -- Employer’s Duties -- Contractor’s Duties -- Design Responsibility -- Engineer -- Time for Completion -- Variations -- Tests -- Certificates -- Defects Notification Period and (Post Contractual) Defects Liability -- Termination -- Discharge, Frustration and Force Majeure -- Risk, Insurance and Exceptional Risk -- Bonds, Guarantees, Letters of Credit -- Claim Management -- Disputes -- Samples -- Delay Schedule.
520 |aIn 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design-Build and Turnkey Contract (the 1992 ‘‘Orange Book’’). These conditions, known as the ‘‘FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so-called Red Book, for works designed by the Employer l Plant and Design-Build, the so-called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects, the so-called Silver Book, for works designed by the Contractor The ?rst is intended for construction works where the Employer is responsible for the design, as for per the previous so-called Red Book 4th Edition (1987), with an important role for the Engineer. The other two conditions of contract are intended for situations when the Contractor is responsible for the design. The Plant and Design-Build Contract has the traditional Engineer while the EPC/Turnkey Contract has a two-party arran- ment, generally with an Employer’s Representative as one of the parties.
650 0|aPrivate international law.
650 0|aConflict of laws.
650 0|aInternational law.
650 0|aComparative law.
650 0|aBuilding laws.
650 14|aPrivate International Law, International and Foreign Law, Comparative Law.
650 24|aBuilding Law for Engineers and Architects.
700 1 |aHök, Götz-Sebastian.|eauthor.|4aut|4http://id.loc.gov/vocabulary/relators/aut
710 2 |aSpringerLink (Online service)
773 0 |tSpringer Nature eBook
776 08|iPrinted edition:|z9783642020995
776 08|iPrinted edition:|z9783642021015
856 40|uhttps://doi.org/10.1007/978-3-642-02100-8
912 |aZDB-2-SHU
912 |aZDB-2-SXLC
950 |aHumanities, Social Sciences and Law (SpringerNature-11648)
950 |aLaw and Criminology (R0) (SpringerNature-43727)